ITAC Assessment: MI0230
ITAC logo
ITAC Assessment: MI0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Eyeglass Lenses
NAICS 339115: Ophthalmic Goods Manufacturing
SIC 3851: Ophthalmic Goods
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 80,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,487,030 14,929,200
kWh
Electricity Demand $337,853 26,217
kW-mo/yr
Electricity Fees $10,800 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $617,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $369,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $185,551 $480 $167,715
716,730
kWh
$17,836
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $146,160 $70,200 $132,163
564,798
kWh
$13,997
-
kW-mo/yr
03 2.7491: Insulate glazing, walls, ceilings, and roofs $88,716 $46,097 $80,220
342,819
kWh
$8,496
-
kW-mo/yr
04 2.2443: Re-use or recycle hot or cold process exhaust air $64,249 $12,488 $58,096
248,274
kWh
$6,153
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,101 $41,600 $40,784
174,304
kWh
$4,317
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,707 $1,660 $15,942
68,128
kWh
$1,765
-
kW-mo/yr
07 2.7496: Install partitions to reduce size of conditioned space $15,150 $4,720 $13,694
58,522
kWh
$1,456
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,512 $1,040 $9,507
40,628
kWh
$1,005
-
kW-mo/yr
09 2.7447: Install vinyl strip / high speed / air curtain doors $8,652 $6,802 $8,046
34,383
kWh
$606
-
kW-mo/yr
10 2.2136: Install / repair insulation on steam lines $7,962 $1,589 $7,202
30,776
kWh
$760
-
kW-mo/yr
11 2.2136: Install / repair insulation on steam lines $7,581 $3,569 $6,859
29,310
kWh
$722
-
kW-mo/yr
12 2.7496: Install partitions to reduce size of conditioned space $6,487 $2,848 $5,869
25,081
kWh
$618
-
kW-mo/yr
13 2.4231: Reduce the pressure of compressed air to the minimum required $5,524 $80 $4,770
20,384
kWh
$754
-
kW-mo/yr
14 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,550 $40 $4,112
17,572
kWh
$438
-
kW-mo/yr
15 2.7135: Install occupancy sensors $2,794 $320 $2,523
10,783
kWh
$271
-
kW-mo/yr
16 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,194 $3,160 $1,078
4,607
kWh
$116
-
kW-mo/yr
TOTAL RECOMMENDED $617,890 $196,693 $558,580
2,387,099
kWh
$59,310
-
kW-mo/yr
TOTAL IMPLEMENTED $369,380 $95,674 $333,874
1,426,821
kWh
$35,506
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs