Assessment Year | 2010 |
---|---|
Principal Product | Steel Prodcuts |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $1 M to 5M |
# of Employees | 69 |
Plant Area |
200,000
ft2
|
Annual Production | 52,362,675
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,713 | 1,757,434 |
kWh
|
$0.067 |
Electricity Demand | $39,784 | 7,428 |
kW-mo/yr
|
$5.36 |
Electricity Fees | $10,605 | - |
|
- |
Natural Gas | $35,679 | 3,778 |
MMBtu
|
$9.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $18,738 | $7,700 |
$88
1,327
kWh
|
$69
-
kW-mo/yr
|
$18,581
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,099 | $59,000 |
$15,012
226,418
kWh
|
$2,332
-
kW-mo/yr
|
- | $246 | $(-491.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,855 | $4,900 |
$5,160
77,828
kWh
|
$818
-
kW-mo/yr
|
- | $122 | $(-245.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,181 | $10 |
$4,201
63,371
kWh
|
$980
-
kW-mo/yr
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $5,027 | $10,100 |
$4,076
61,476
kWh
|
$951
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,199 | $8,511 |
$1,783
26,888
kWh
|
$416
-
kW-mo/yr
|
- | - | - | |
07 | 2.4314: Use synthetic lubricant | $1,752 | $900 |
$1,420
21,413
kWh
|
$332
-
kW-mo/yr
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $826 | $1,200 |
$670
10,100
kWh
|
$156
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $383 | $300 |
$221
3,329
kWh
|
$24
-
kW-mo/yr
|
- | $58 | $80 | |
TOTAL RECOMMENDED | $57,060 | $92,621 |
$32,631
492,150
kWh
|
$6,078
-
kW-mo/yr
|
$18,581
-
MMBtu
|
$426 | $(-656.0) | ||
TOTAL IMPLEMENTED | $30,334 | $72,421 |
$26,156
394,505
kWh
|
$4,546
-
kW-mo/yr
|
- | $368 | $(-736.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs