ITAC Assessment: MI0227
ITAC logo
ITAC Assessment: MI0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Dried Fruit
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 500,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,637,527 34,953,474
kWh
Electricity Demand $685,309 69,925
kW-mo/yr
Electricity Fees $237,933 -
Natural Gas $55,003 120,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,046

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $63,004 $11,425 $48,979
1,042,108
kWh
$14,025
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $30,352 $21,342 $19,404
406,452
kWh
$10,948
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,918 $1,660 $7,999
170,199
kWh
$8,919
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,932 $19,454 $8,855
188,398
kWh
$5,077
-
kW-mo/yr
-
05 2.7425: Clean or color roof to reduce solar load $13,886 $142,619 $9,436
200,766
kWh
$4,450
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,306 $12,160 $7,190
152,970
kWh
$4,116
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,036 $13,230 $5,743
122,195
kWh
$3,293
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $8,569 $8,859 $6,569
139,766
kWh
$2,000
-
kW-mo/yr
-
09 2.2447: Heat water with exhaust heat $6,137 $8,859 $2,452
52,162
kWh
$3,685
-
kW-mo/yr
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $3,975 $3,480 - - $3,975
-
MMBtu
11 2.7135: Install occupancy sensors $3,170 $3,500 $2,464
52,430
kWh
$706
-
kW-mo/yr
-
TOTAL RECOMMENDED $180,285 $246,588 $119,091
2,527,446
kWh
$57,219
-
kW-mo/yr
$3,975
-
MMBtu
TOTAL IMPLEMENTED $119,046 $187,318 $82,459
1,754,441
kWh
$36,587
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs