Assessment Year | 2012 |
---|---|
Principal Product | Dried Fruit |
NAICS | 311423: Dried and Dehydrated Food Manufacturing |
SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
Sales Range | $50 M to 100M |
# of Employees | 260 |
Plant Area |
500,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,637,527 | 34,953,474 |
kWh
|
$0.047 |
Electricity Demand | $685,309 | 69,925 |
kW-mo/yr
|
$9.80 |
Electricity Fees | $237,933 | - |
|
- |
Natural Gas | $55,003 | 120,520 |
MMBtu
|
$0.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $180,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $119,046 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $63,004 | $11,425 |
$48,979
1,042,108
kWh
|
$14,025
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,352 | $21,342 |
$19,404
406,452
kWh
|
$10,948
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,918 | $1,660 |
$7,999
170,199
kWh
|
$8,919
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,932 | $19,454 |
$8,855
188,398
kWh
|
$5,077
-
kW-mo/yr
|
- | |
05 | 2.7425: Clean or color roof to reduce solar load | $13,886 | $142,619 |
$9,436
200,766
kWh
|
$4,450
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,306 | $12,160 |
$7,190
152,970
kWh
|
$4,116
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,036 | $13,230 |
$5,743
122,195
kWh
|
$3,293
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,569 | $8,859 |
$6,569
139,766
kWh
|
$2,000
-
kW-mo/yr
|
- | |
09 | 2.2447: Heat water with exhaust heat | $6,137 | $8,859 |
$2,452
52,162
kWh
|
$3,685
-
kW-mo/yr
|
- | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,975 | $3,480 | - | - |
$3,975
-
MMBtu
|
|
11 | 2.7135: Install occupancy sensors | $3,170 | $3,500 |
$2,464
52,430
kWh
|
$706
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $180,285 | $246,588 |
$119,091
2,527,446
kWh
|
$57,219
-
kW-mo/yr
|
$3,975
-
MMBtu
|
||
TOTAL IMPLEMENTED | $119,046 | $187,318 |
$82,459
1,754,441
kWh
|
$36,587
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs