Assessment Year | 2012 |
---|---|
Principal Product | High Power Resistors |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3676: Electronic Resistors |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
40,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,411 | 1,284,540 |
kWh
|
$0.056 |
Electricity Demand | $30,674 | 3,165 |
kW-mo/yr
|
$9.69 |
Electricity Fees | $7,597 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,285 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $10,726 | $1,800 |
$9,602
154,877
kWh
|
$1,124
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,561 | $1,660 |
$5,110
82,421
kWh
|
$1,451
-
kW-mo/yr
|
|
03 | 2.2622: Replace existing chiller with high efficiency model | $4,281 | $11,600 |
$2,769
44,664
kWh
|
$1,512
-
kW-mo/yr
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $3,238 | $80 |
$2,095
33,784
kWh
|
$1,143
-
kW-mo/yr
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,133 | $5,826 |
$1,377
22,213
kWh
|
$756
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,479 | $1,075 |
$1,033
16,666
kWh
|
$446
-
kW-mo/yr
|
|
07 | 2.7496: Install partitions to reduce size of conditioned space | $1,296 | $2,784 |
$838
13,513
kWh
|
$458
-
kW-mo/yr
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,022 | $80 |
$840
13,547
kWh
|
$182
-
kW-mo/yr
|
|
09 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $712 | $1,208 |
$460
7,419
kWh
|
$252
-
kW-mo/yr
|
|
10 | 2.7135: Install occupancy sensors | $685 | $541 |
$443
7,138
kWh
|
$242
-
kW-mo/yr
|
|
11 | 2.2136: Install / repair insulation on steam lines | $929 | $2,335 |
$600
9,672
kWh
|
$329
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $33,062 | $28,989 |
$25,167
405,914
kWh
|
$7,895
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $26,285 | $16,215 |
$20,609
332,412
kWh
|
$5,676
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs