ITAC Assessment: MI0221
ITAC logo
ITAC Assessment: MI0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product High Power Resistors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3676: Electronic Resistors
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 40,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,411 1,284,540
kWh
Electricity Demand $30,674 3,165
kW-mo/yr
Electricity Fees $7,597 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,062 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $10,726 $1,800 $9,602
154,877
kWh
$1,124
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,561 $1,660 $5,110
82,421
kWh
$1,451
-
kW-mo/yr
03 2.2622: Replace existing chiller with high efficiency model $4,281 $11,600 $2,769
44,664
kWh
$1,512
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $3,238 $80 $2,095
33,784
kWh
$1,143
-
kW-mo/yr
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,133 $5,826 $1,377
22,213
kWh
$756
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,479 $1,075 $1,033
16,666
kWh
$446
-
kW-mo/yr
07 2.7496: Install partitions to reduce size of conditioned space $1,296 $2,784 $838
13,513
kWh
$458
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,022 $80 $840
13,547
kWh
$182
-
kW-mo/yr
09 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $712 $1,208 $460
7,419
kWh
$252
-
kW-mo/yr
10 2.7135: Install occupancy sensors $685 $541 $443
7,138
kWh
$242
-
kW-mo/yr
11 2.2136: Install / repair insulation on steam lines $929 $2,335 $600
9,672
kWh
$329
-
kW-mo/yr
TOTAL RECOMMENDED $33,062 $28,989 $25,167
405,914
kWh
$7,895
-
kW-mo/yr
TOTAL IMPLEMENTED $26,285 $16,215 $20,609
332,412
kWh
$5,676
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings