ITAC Assessment: SU0200
ITAC logo
ITAC Assessment: SU0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Gas turbine repair
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 260,000
ft2
Annual Production 703,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,416 2,174,000
kWh
Electricity Demand $99,287 7,919
kW-mo/yr
Electricity Fees $33,760 -
Natural Gas $125,550 17,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,881

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $470 - $323
4,608
kWh
$147
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $5,068 $375 - - $5,068
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,047 $169 $1,403
20,037
kWh
$644
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $9,439 $1,636 - - $9,439
-
MMBtu
05 2.7135: Install occupancy sensors $327 $374 $327
4,669
kWh
- -
TOTAL RECOMMENDED $17,351 $2,554 $2,053
29,314
kWh
$791
-
kW-mo/yr
$14,507
-
MMBtu
TOTAL IMPLEMENTED $16,881 $2,554 $1,730
24,706
kWh
$644
-
kW-mo/yr
$14,507
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs