Assessment Year | 2011 |
---|---|
Principal Product | Advertising Novelties |
NAICS | 339950: Sign Manufacturing |
SIC | 3993: Signs and Advertising Specialties |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
210,000
ft2
|
Annual Production | 127,750,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,658 | 4,131,720 |
kWh
|
$0.059 |
Electricity Demand | $107,736 | 11,354 |
kW-mo/yr
|
$9.49 |
Electricity Fees | $50,193 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $121,192 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,558 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $36,428 | $124,975 |
$28,286
291,605
kWh
|
$8,142
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $27,894 | $2,000 |
$21,659
223,286
kWh
|
$6,235
-
kW-mo/yr
|
|
03 | 2.6218: Turn off equipment when not in use | $18,870 | $7,920 |
$14,654
151,073
kWh
|
$4,216
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,184 | $41,193 |
$12,568
129,565
kWh
|
$3,616
-
kW-mo/yr
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,322 | $1,275 |
$4,908
50,603
kWh
|
$1,414
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,700 | $1,210 |
$3,905
40,259
kWh
|
$1,795
-
kW-mo/yr
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,900 | $40 |
$3,495
36,029
kWh
|
$1,405
-
kW-mo/yr
|
|
08 | 2.4239: Eliminate or reduce compressed air usage | $4,894 | $2,200 |
$3,803
39,211
kWh
|
$1,091
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $121,192 | $180,813 |
$93,278
961,631
kWh
|
$27,914
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $56,558 | $12,160 |
$43,611
449,599
kWh
|
$12,947
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs