Assessment Year | 2010 |
---|---|
Principal Product | Boats |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $1 M to 5M |
# of Employees | 27 |
Plant Area |
220,000
ft2
|
Annual Production | 20
pieces
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,322 | 1,253,510 |
kWh
|
$0.069 |
Electricity Demand | $38,015 | 4,796 |
kW-mo/yr
|
$7.93 |
Electricity Fees | $18,661 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,944 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $23,798 | $2,550 |
$17,159
150,421
kWh
|
$6,639
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,774 | $1,210 |
$7,769
68,152
kWh
|
$3,005
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,594 | $40 |
$2,590
22,717
kWh
|
$1,004
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,824 | $7,562 |
$2,107
19,151
kWh
|
$717
-
kW-mo/yr
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,359 | $2,850 |
$968
8,803
kWh
|
$391
-
kW-mo/yr
|
- | |
06 | 3.4154: Eliminate leaks in water lines and valves | $1,187 | $180 | - | - | $1,187 | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $4,983 | $2,040 |
$3,556
32,328
kWh
|
$1,427
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $48,519 | $16,432 |
$34,149
301,572
kWh
|
$13,183
-
kW-mo/yr
|
$1,187 | ||
TOTAL IMPLEMENTED | $16,944 | $3,430 |
$11,325
100,480
kWh
|
$4,432
-
kW-mo/yr
|
$1,187 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs