| Assessment Year | 2010 |
|---|---|
| Principal Product | Boats |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $1 M to 5M |
| # of Employees | 27 |
| Plant Area |
220,000
ft2
|
| Annual Production | 20
pieces
|
| Production Hrs. Annual | 2,168
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,322 | 1,253,510 |
kWh
|
$0.069 |
| Electricity Demand | $38,015 | 4,796 |
kW-mo/yr
|
$7.93 |
| Electricity Fees | $18,661 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,944 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $23,798 | $2,550 |
$17,159
150,421
kWh
|
$6,639
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,774 | $1,210 |
$7,769
68,152
kWh
|
$3,005
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,594 | $40 |
$2,590
22,717
kWh
|
$1,004
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,824 | $7,562 |
$2,107
19,151
kWh
|
$717
-
kW-mo/yr
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,359 | $2,850 |
$968
8,803
kWh
|
$391
-
kW-mo/yr
|
- | |
| 06 | 3.4154: Eliminate leaks in water lines and valves | $1,187 | $180 | - | - | $1,187 | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $4,983 | $2,040 |
$3,556
32,328
kWh
|
$1,427
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $48,519 | $16,432 |
$34,149
301,572
kWh
|
$13,183
-
kW-mo/yr
|
$1,187 | ||
| TOTAL IMPLEMENTED | $16,944 | $3,430 |
$11,325
100,480
kWh
|
$4,432
-
kW-mo/yr
|
$1,187 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs