ITAC Assessment: AM0465
ITAC logo
ITAC Assessment: AM0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Oilfield equipment wellheads
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 94
Plant Area 154,236
ft2
Annual Production 9,500
pieces
Production Hrs. Annual 5,218
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,962 4,766,400
kWh
Electricity Demand $65,009 8,856
kW-mo/yr
Electricity Fees $7,119 -
Natural Gas $127,933 19,004
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,500 $1,000 $23,000
450,000
kWh
$4,500
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $26,300 $1,000 $26,300
515,250
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,550 $840 $6,670
130,700
kWh
$880
-
kW-mo/yr
- - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,100 - $7,100
139,400
kWh
- - - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,500 $300 - - $4,500
-
lb
- -
06 2.7134: Use photocell controls $1,605 $570 $1,150
22,600
kWh
$455
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,580 $1,075 $475
9,320
kWh
$90
-
kW-mo/yr
- $300 $715
08 2.4322: Use or replace with energy efficient substitutes $1,370 $900 $1,050
20,600
kWh
$320
-
kW-mo/yr
- - -
09 2.6212: Turn off equipment during breaks, reduce operating time $980 - $980
19,150
kWh
- - - -
10 2.4314: Use synthetic lubricant $421 - $316
6,200
kWh
$105
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $78,906 $5,685 $67,041
1,313,220
kWh
$6,350
-
kW-mo/yr
$4,500
-
lb
$300 $715
TOTAL IMPLEMENTED $73,985 $5,385 $66,725
1,307,020
kWh
$6,245
-
kW-mo/yr
- $300 $715
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs