Assessment Year | 2010 |
---|---|
Principal Product | Gears |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 84 |
Plant Area |
19,200
ft2
|
Annual Production | 125,000
pieces
|
Production Hrs. Annual | 2,295
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,828 | 1,083,731 |
kWh
|
$0.073 |
Electricity Demand | $30,780 | 4,054 |
kW-mo/yr
|
$7.59 |
Electricity Fees | $19,245 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,170 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,674 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $15,179 | $5,366 |
$10,534
117,041
kWh
|
$4,645
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $13,451 | $2,000 |
$9,335
103,729
kWh
|
$4,116
-
kW-mo/yr
|
|
03 | 2.4322: Use or replace with energy efficient substitutes | $5,033 | $10,500 |
$3,443
38,250
kWh
|
$1,590
-
kW-mo/yr
|
|
04 | 2.7145: Install skylights | $4,317 | $2,400 |
$2,996
33,293
kWh
|
$1,321
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,161 | $7,164 |
$2,194
24,372
kWh
|
$967
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,029 | $1,210 |
$1,407
15,631
kWh
|
$622
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $43,170 | $28,640 |
$29,909
332,316
kWh
|
$13,261
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $23,674 | $20,874 |
$16,379
181,982
kWh
|
$7,295
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs