ITAC Assessment: NV0051
ITAC logo
ITAC Assessment: NV0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product recreational motor homes
NAICS
n/a
SIC 3716: Motor Homes
Sales Range $100
M
to 500
M
# of Employees 325
Plant Area 120,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 2,431
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,691 1,735,639
kWh
Electricity Demand $85,483 6,646
kW-mo/yr
Electricity Fees $2,100 -
Natural Gas $43,480 6,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $469 $81 $248
3,224
kWh
$221
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $727 $1,625 - - $727
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $930 $300 $930
12,016
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $820 - $820
10,551
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $185 - $103
1,465
kWh
$82
-
kW-mo/yr
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $18,575 $17,350 - - - $18,575
-
lb
TOTAL RECOMMENDED $21,706 $19,356 $2,101
27,256
kWh
$303
-
kW-mo/yr
$727
-
MMBtu
$18,575
-
lb
TOTAL IMPLEMENTED $20,159 $17,731 $1,281
16,705
kWh
$303
-
kW-mo/yr
- $18,575
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs