ITAC Assessment: MI0187
ITAC logo
ITAC Assessment: MI0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Aviation parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 355
Plant Area 120,000
ft2
Annual Production 700
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $437,236 5,700,870
kWh
Electricity Demand $91,063 16,847
kW-mo/yr
Electricity Fees $82,283 -
Natural Gas $76,762 6,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $24,507 $1,800 $22,007
244,517
kWh
$2,500
-
kW-mo/yr
-
02 2.3192: Use fossil fuel powered generator during peak demand periods $17,920 $100 - $17,920
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $17,911 - - - $17,911
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $11,158 $640 $10,019
111,324
kWh
$1,139
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,880 $4,960 $9,278
101,953
kWh
$1,602
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $6,598 $640 $4,634
51,485
kWh
$1,964
-
kW-mo/yr
-
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $5,498 - $4,929
54,766
kWh
$569
-
kW-mo/yr
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $5,438 $180 - - $5,438
-
MMBtu
09 2.7447: Install vinyl strip / high speed / air curtain doors $2,165 $360 $1,944
21,604
kWh
$221
-
kW-mo/yr
-
TOTAL RECOMMENDED $102,075 $8,680 $52,811
585,649
kWh
$25,915
-
kW-mo/yr
$23,349
-
MMBtu
TOTAL IMPLEMENTED $60,746 $8,580 $47,882
530,883
kWh
$7,426
-
kW-mo/yr
$5,438
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs