ITAC Assessment: MI0169
ITAC logo
ITAC Assessment: MI0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Chicken Sausage
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 82
Plant Area 16,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 3,250
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $413,794 2,274,800
kWh
Electricity Demand $122,497 15,108
kW-mo/yr
Electricity Fees $2,400 -
Fuel Oil #6 $104,730 7,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $131,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.6218: Turn off equipment when not in use $79,083 $3,320 $67,907
373,321
kWh
$11,176
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,749 $1,210 $16,070
88,346
kWh
$4,679
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $19,089 $3,928 $17,990
98,900
kWh
$1,099
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $7,803 $18,301 $6,098
33,519
kWh
$1,705
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,967 $40 $2,359
12,971
kWh
$608
-
kW-mo/yr
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,528 $1,240 - - $1,528
-
MMBtu
TOTAL RECOMMENDED $131,219 $28,039 $110,424
607,057
kWh
$19,267
-
kW-mo/yr
$1,528
-
MMBtu
TOTAL IMPLEMENTED $99,832 $4,530 $83,977
461,667
kWh
$15,855
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs