ITAC Assessment: MI0161
ITAC logo
ITAC Assessment: MI0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Concrete Ready-Mix & Block
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 1,000,000
ft2
Annual Production 108,300
units
Production Hrs. Annual 2,700
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,423 2,489,040
kWh
Electricity Demand $84,634 11,639
kW-mo/yr
Electricity Fees $25,365 -
Fuel Oil #1 $700,300 29,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.4322: Use or replace with energy efficient substitutes $32,580 $89,078 $22,557
310,277
kWh
$10,023
-
kW-mo/yr
-
02 2.8226: Increase efficiency of trucks $27,036 $41,580 - - $27,036
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $7,253 $1,800 $4,868
67,005
kWh
$2,385
-
kW-mo/yr
-
04 2.8226: Increase efficiency of trucks $50,304 $150,300 - - $50,304
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,779 $720 $4,124
57,741
kWh
$2,655
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,042 $1,032 $925
12,674
kWh
$117
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $295 $24 $190
925
kWh
$105
-
kW-mo/yr
-
TOTAL RECOMMENDED $125,289 $284,534 $32,664
448,622
kWh
$15,285
-
kW-mo/yr
$77,340
-
MMBtu
TOTAL IMPLEMENTED $40,696 $90,854 $27,796
381,617
kWh
$12,900
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs