| Assessment Year | 2008 |
|---|---|
| Principal Product | Concrete Ready-Mix & Block |
| NAICS | 327390: Other Concrete Product Manufacturing |
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 108,300
units
|
| Production Hrs. Annual | 2,700
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $181,423 | 2,489,040 |
kWh
|
$0.073 |
| Electricity Demand | $84,634 | 11,639 |
kW-mo/yr
|
$7.27 |
| Electricity Fees | $25,365 | - |
|
- |
| Fuel Oil #1 | $700,300 | 29,951 |
MMBtu
|
$23.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $125,289 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,696 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $32,580 | $89,078 |
$22,557
310,277
kWh
|
$10,023
-
kW-mo/yr
|
- | |
| 02 | 2.8226: Increase efficiency of trucks | $27,036 | $41,580 | - | - |
$27,036
-
MMBtu
|
|
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $7,253 | $1,800 |
$4,868
67,005
kWh
|
$2,385
-
kW-mo/yr
|
- | |
| 04 | 2.8226: Increase efficiency of trucks | $50,304 | $150,300 | - | - |
$50,304
-
MMBtu
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,779 | $720 |
$4,124
57,741
kWh
|
$2,655
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,042 | $1,032 |
$925
12,674
kWh
|
$117
-
kW-mo/yr
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $295 | $24 |
$190
925
kWh
|
$105
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $125,289 | $284,534 |
$32,664
448,622
kWh
|
$15,285
-
kW-mo/yr
|
$77,340
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $40,696 | $90,854 |
$27,796
381,617
kWh
|
$12,900
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs