ITAC Assessment: MI0156
ITAC logo
ITAC Assessment: MI0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Glass and Plastic Ware
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 30,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,338 726,475
kWh
Electricity Demand $14,983 2,305
kW-mo/yr
Electricity Fees $5,804 -
Natural Gas $51,903 5,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,395

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2424: Use heat in flue gases to preheat products or materials $7,785 $1,800 - - $7,785
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $6,674 $1,232 - - $6,674
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $4,301 $2,121 $3,364
49,975
kWh
$937
-
kW-mo/yr
-
04 2.7145: Install skylights $2,655 $5,612 $2,077
60,850
kWh
$578
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,688 $1,074 $1,286
19,100
kWh
$402
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,033 $30 $912
13,549
kWh
$121
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $676 $2,170 $605
7,927
kWh
$71
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,812 $14,039 $8,244
151,401
kWh
$2,109
-
kW-mo/yr
$14,459
-
MMBtu
TOTAL IMPLEMENTED $9,395 $2,336 $2,198
32,649
kWh
$523
-
kW-mo/yr
$6,674
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs