Assessment Year | 2007 |
---|---|
Principal Product | Aircraft parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
277,000
ft2
|
Annual Production | 11,500
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $448,522 | 6,506,400 |
kWh
|
$0.069 |
Electricity Demand | $116,871 | 11,377 |
kW-mo/yr
|
$10.27 |
Electricity Fees | $98,332 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $216,374 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $79,007 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $99,787 | $131,000 |
$82,492
1,178,460
kWh
|
$17,295
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,215 | $73,710 |
$34,294
490,614
kWh
|
- | $6,921 | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $30,511 | $120 |
$25,212
360,180
kWh
|
$5,299
-
kW-mo/yr
|
- | - | |
04 | 2.7122: Disconnect ballasts | $27,192 | $1,450 |
$18,319
262,080
kWh
|
$8,873
-
kW-mo/yr
|
- | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $10,388 | $1,250 |
$8,560
124,452
kWh
|
$1,828
-
kW-mo/yr
|
- | - | |
06 | 4.821: Pay bills on time to avoid late fees | $3,146 | $300 | - | - | - | $3,146 | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,092 | $1,074 |
$2,479
35,421
kWh
|
$613
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,043 | $30 |
$796
11,365
kWh
|
$247
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $216,374 | $208,934 |
$172,152
2,462,572
kWh
|
$34,155
-
kW-mo/yr
|
$6,921 | $3,146 | ||
TOTAL IMPLEMENTED | $79,007 | $75,234 |
$62,781
897,580
kWh
|
$6,159
-
kW-mo/yr
|
$6,921 | $3,146 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs