ITAC Assessment: MI0154
ITAC logo
ITAC Assessment: MI0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 277,000
ft2
Annual Production 11,500
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $448,522 6,506,400
kWh
Electricity Demand $116,871 11,377
kW-mo/yr
Electricity Fees $98,332 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $216,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $99,787 $131,000 $82,492
1,178,460
kWh
$17,295
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $41,215 $73,710 $34,294
490,614
kWh
- $6,921 -
03 2.7221: Lower temperature during the winter season and vice-versa $30,511 $120 $25,212
360,180
kWh
$5,299
-
kW-mo/yr
- -
04 2.7122: Disconnect ballasts $27,192 $1,450 $18,319
262,080
kWh
$8,873
-
kW-mo/yr
- -
05 2.6231: Utilize controls to operate equipment only when needed $10,388 $1,250 $8,560
124,452
kWh
$1,828
-
kW-mo/yr
- -
06 4.821: Pay bills on time to avoid late fees $3,146 $300 - - - $3,146
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,092 $1,074 $2,479
35,421
kWh
$613
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,043 $30 $796
11,365
kWh
$247
-
kW-mo/yr
- -
TOTAL RECOMMENDED $216,374 $208,934 $172,152
2,462,572
kWh
$34,155
-
kW-mo/yr
$6,921 $3,146
TOTAL IMPLEMENTED $79,007 $75,234 $62,781
897,580
kWh
$6,159
-
kW-mo/yr
$6,921 $3,146
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs