ITAC Assessment: MI0143
ITAC logo
ITAC Assessment: MI0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Baked Goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 440
Plant Area 225,000
ft2
Annual Production 135,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,057,565 30,355,185
kWh
Electricity Demand $316,046 35,116
kW-mo/yr
Electricity Fees $195,850 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $144,259 $23,000 $4,145
61,152
kWh
- $140,114
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $47,797 $1,074 $38,613
569,686
kWh
$9,184
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $14,665 $30 $11,508
169,788
kWh
$3,157
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,791 $3,906 $9,976
147,184
kWh
$1,815
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,100 $375 $6,005
88,596
kWh
$95
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,056 $1,418 $1,740
25,669
kWh
$316
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $1,826 $3,400 $1,326
19,573
kWh
$500
-
kW-mo/yr
-
TOTAL RECOMMENDED $228,494 $33,203 $73,313
1,081,648
kWh
$15,067
-
kW-mo/yr
$140,114
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs