ITAC Assessment: MI0141
ITAC logo
ITAC Assessment: MI0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Printing Products
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 400
Plant Area 60,000
ft2
Annual Production 1,500
bushels
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,700 1,067,400
kWh
Electricity Demand $17,548 2,932
kW-mo/yr
Electricity Fees $10,441 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2622: Replace existing chiller with high efficiency model $20,786 $36,000 $17,719
256
kWh
$3,067
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $4,232 $200 $3,607
52
kWh
$625
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $6,036 - $5,143
74
kWh
$893
-
kW-mo/yr
04 2.7229: Air condition only space necessary $2,681 $160 $2,285
33
kWh
$396
-
kW-mo/yr
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,825 $2,460 $1,556
22
kWh
$269
-
kW-mo/yr
TOTAL RECOMMENDED $35,560 $38,820 $30,310
437
kWh
$5,250
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs