ITAC Assessment: MI0140
ITAC logo
ITAC Assessment: MI0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 25,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $695,859 10,013,052
kWh
Electricity Demand $143,631 24,140
kW-mo/yr
Electricity Fees $53,168 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $17,875 $30 $14,108
202,993
kWh
$3,767
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,834 $1,074 $11,966
172,166
kWh
$2,868
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,779 $41,070 $9,327
134,215
kWh
$1,452
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $7,195 $940 $5,832
83,916
kWh
$1,363
-
kW-mo/yr
05 2.4322: Use or replace with energy efficient substitutes $2,523 $6,267 $2,183
31,408
kWh
$340
-
kW-mo/yr
TOTAL RECOMMENDED $53,206 $49,381 $43,416
624,698
kWh
$9,790
-
kW-mo/yr
TOTAL IMPLEMENTED $39,904 $2,044 $31,906
459,075
kWh
$7,998
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs