ITAC Assessment: MI0135
ITAC logo
ITAC Assessment: MI0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Frozen Juice Concentrate
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 250,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $997 36
kWh
Electricity Demand $58 284
kW-mo/yr
Electricity Fees $435 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $36,603 $244 $32,471
685
kWh
$4,132
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,711 $68,400 $27,802
586,535
kWh
$3,909
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $27,098 $5,400 $23,910
504,420
kWh
$3,188
-
kW-mo/yr
04 2.7111: Reduce illumination to minimum necessary levels $8,764 $223 $7,390
147,312
kWh
$1,374
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,637 $1,074 $3,836
80,925
kWh
$801
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $495 $30 $334
7,048
kWh
$161
-
kW-mo/yr
TOTAL RECOMMENDED $109,308 $75,371 $95,743
1,326,925
kWh
$13,565
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs