Assessment Year | 2006 |
---|---|
Principal Product | Bakery Goods |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
230,000
ft2
|
Annual Production | 65,314,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $992,459 | 16,404,000 |
kWh
|
$0.061 |
Electricity Demand | $199,701 | 33,963 |
kW-mo/yr
|
$5.88 |
Electricity Fees | $204,266 | - |
|
- |
Natural Gas | $752,739 | 84,954 |
MMBtu
|
$8.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $249,241 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $144,930 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $99,039 | $135,000 |
$89,866
1,135,680
kWh
|
$9,173
-
kW-mo/yr
|
|
02 | 2.2437: Recover waste heat from equipment | $45,221 | $10,000 |
$40,409
510,667
kWh
|
$4,812
-
kW-mo/yr
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $45,075 | $16,854 |
$40,911
517,009
kWh
|
$4,164
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $35,182 | $964 |
$30,838
389,716
kWh
|
$4,344
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $14,015 | $780 |
$12,683
153,730
kWh
|
$1,332
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,709 | $30 |
$8,716
110,145
kWh
|
$1,993
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $249,241 | $163,628 |
$223,423
2,816,947
kWh
|
$25,818
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $144,930 | $135,994 |
$129,420
1,635,541
kWh
|
$15,510
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs