ITAC Assessment: KU0421
ITAC logo
ITAC Assessment: KU0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Abrasive Products
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $1
M
to 5
M
# of Employees 7
Plant Area 6,469
ft2
Annual Production 40,000
ton
Production Hrs. Annual 3,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,419 549,824
kWh
Natural Gas $32,445 10,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,665 $29,052 $(-1,110.0)
(-11,430)
kWh
$9,775
-
MMBtu
02 2.4133: Use most efficient type of electric motors $4,556 $19,846 $4,556
46,893
kWh
-
03 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $1,509 $1,200 $1,509
15,533
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $996 $580 $996
10,258
kWh
-
05 2.4314: Use synthetic lubricant $484 $366 $484
4,982
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $285 $850 $285
2,931
kWh
-
07 2.7134: Use photocell controls $199 $30 $199
2,052
kWh
-
TOTAL RECOMMENDED $16,694 $51,924 $6,919
71,219
kWh
$9,775
-
MMBtu
TOTAL IMPLEMENTED $4,755 $19,876 $4,755
48,945
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs