Assessment Year | 2006 |
---|---|
Principal Product | Milk |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 165 |
Plant Area |
200,000
ft2
|
Annual Production | 105,270
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,393,761 | 28,730,800 |
kWh
|
$0.049 |
Electricity Demand | $281,096 | 47,498 |
kW-mo/yr
|
$5.92 |
Electricity Fees | $161,579 | - |
|
- |
Natural Gas | $191,138 | 17,190 |
MMBtu
|
$11.12 |
Fuel Oil #1 | $1,988,913 | 125,219 |
MMBtu
|
$15.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $166,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $131,747 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $61,073 | $1,290 |
$52,157
1,088,191
kWh
|
$8,916
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,374 | $75,894 |
$24,212
623,860
kWh
|
$4,162
-
kW-mo/yr
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $32,634 | $35,000 | - | - |
$32,634
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,438 | $1,074 |
$21,366
425,032
kWh
|
$3,072
-
kW-mo/yr
|
- | |
05 | 2.6218: Turn off equipment when not in use | $9,589 | $850 |
$8,139
169,808
kWh
|
$1,450
-
kW-mo/yr
|
- | |
06 | 2.4323: Use optimum size and capacity equipment | $6,852 | $4,800 |
$5,579
110,990
kWh
|
$1,273
-
kW-mo/yr
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $4,013 | $395 |
$3,511
73,266
kWh
|
$502
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $166,973 | $119,303 |
$114,964
2,491,147
kWh
|
$19,375
-
kW-mo/yr
|
$32,634
-
MMBtu
|
||
TOTAL IMPLEMENTED | $131,747 | $38,609 |
$85,173
1,756,297
kWh
|
$13,940
-
kW-mo/yr
|
$32,634
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs