ITAC Assessment: MI0125
ITAC logo
ITAC Assessment: MI0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 200,000
ft2
Annual Production 105,270
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,393,761 28,730,800
kWh
Electricity Demand $281,096 47,498
kW-mo/yr
Electricity Fees $161,579 -
Natural Gas $191,138 17,190
MMBtu
Fuel Oil #1 $1,988,913 125,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $61,073 $1,290 $52,157
1,088,191
kWh
$8,916
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $28,374 $75,894 $24,212
623,860
kWh
$4,162
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $32,634 $35,000 - - $32,634
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,438 $1,074 $21,366
425,032
kWh
$3,072
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $9,589 $850 $8,139
169,808
kWh
$1,450
-
kW-mo/yr
-
06 2.4323: Use optimum size and capacity equipment $6,852 $4,800 $5,579
110,990
kWh
$1,273
-
kW-mo/yr
-
07 2.7111: Reduce illumination to minimum necessary levels $4,013 $395 $3,511
73,266
kWh
$502
-
kW-mo/yr
-
TOTAL RECOMMENDED $166,973 $119,303 $114,964
2,491,147
kWh
$19,375
-
kW-mo/yr
$32,634
-
MMBtu
TOTAL IMPLEMENTED $131,747 $38,609 $85,173
1,756,297
kWh
$13,940
-
kW-mo/yr
$32,634
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs