ITAC Assessment: MI0118
ITAC logo
ITAC Assessment: MI0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Metal Patio Furniture
NAICS 337124: Metal Household Furniture Manufacturing
SIC 2514: Metal Household Furniture
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 80,000
ft2
Annual Production 230,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,718 1,886,880
kWh
Electricity Demand $66,793 8,103
kW-mo/yr
Electricity Fees $3,190 -
Natural Gas $83,432 11,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $14,993 $9,230 $12,170
239,891
kWh
$2,823
-
kW-mo/yr
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $8,966 $4,628 - - $8,966
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $6,306 $65 $4,483
88,351
kWh
$1,823
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,896 $862 $3,641
71,777
kWh
$591
-
kW-mo/yr
- $(-336.0) -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,613 $56 $1,468
28,944
kWh
$1,145
-
kW-mo/yr
- - -
06 2.7221: Lower temperature during the winter season and vice-versa $1,808 $84 $1,808
35,701
kWh
- - - -
07 4.821: Pay bills on time to avoid late fees $1,061 - - - - - $1,061
TOTAL RECOMMENDED $39,643 $14,925 $23,570
464,664
kWh
$6,382
-
kW-mo/yr
$8,966
-
MMBtu
$(-336.0) $1,061
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs