Assessment Year | 2005 |
---|---|
Principal Product | Ice Cream and Bakery Products |
NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
40,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 2,880
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $231,699 | 4,667,391 |
kWh
|
$0.050 |
Electricity Demand | $89,071 | 10,879 |
kW-mo/yr
|
$8.19 |
Electricity Fees | $41,262 | - |
|
- |
Natural Gas | $167,905 | 23,818 |
MMBtu
|
$7.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,912 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,764 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $51,010 | $72,500 |
$4,610
47,616
kWh
|
- | $40,000 | $6,400 | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $12,178 | $180 |
$12,178
231,470
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $7,508 | $3,000 |
$7,508
142,715
kWh
|
- | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $4,336 | $600 | - | - | - | $4,336 | |
05 | 2.4322: Use or replace with energy efficient substitutes | $2,200 | $6,660 |
$2,200
56,901
kWh
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,386 | $1,030 | - |
$1,746
-
MMBtu
|
$(-360.0) | - | |
07 | 2.2511: Insulate bare equipment | $294 | $195 |
$294
5,579
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $78,912 | $84,165 |
$26,790
484,281
kWh
|
$1,746
-
MMBtu
|
$39,640 | $10,736 | ||
TOTAL IMPLEMENTED | $15,764 | $7,870 |
$14,378
288,371
kWh
|
$1,746
-
MMBtu
|
$(-360.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs