ITAC Assessment: MI0100
ITAC logo
ITAC Assessment: MI0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic Bottle Manufacturing
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 45,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,937 1,367,422
kWh
Electricity Demand $42,950 5,743
kW-mo/yr
Electricity Fees $17,633 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $6,164 $10,917 $6,164
103,832
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,621 $56 $3,521
70,417
kWh
$1,100
-
kW-mo/yr
- -
03 2.8114: Change rate schedules or other changes in utility service $3,664 $600 - - - $3,664
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,993 $870 $2,473
32,618
kWh
- $(-480.0) -
05 2.6231: Utilize controls to operate equipment only when needed $1,436 $200 $1,436
26,100
kWh
- - -
TOTAL RECOMMENDED $17,878 $12,643 $13,594
232,967
kWh
$1,100
-
kW-mo/yr
$(-480.0) $3,664
TOTAL IMPLEMENTED $17,878 $12,643 $13,594
232,967
kWh
$1,100
-
kW-mo/yr
$(-480.0) $3,664
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs