ITAC Assessment: MI0099
ITAC logo
ITAC Assessment: MI0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Milk Processing
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 78,000
ft2
Annual Production 72,000
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $552,444 12,302,400
kWh
Electricity Demand $143,058 24,137
kW-mo/yr
Electricity Fees $88,796 -
Natural Gas $182,773 21,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1224: Replace boiler $31,718 $82,200 - $31,718
-
MMBtu
- -
02 2.4323: Use optimum size and capacity equipment $16,520 $7,062 $16,520
275,979
kWh
- - -
03 2.4224: Upgrade controls on compressors $11,973 $2,750 $11,973
213,571
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,746 $4,736 $8,746
146,692
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,897 $470 $3,777
64,341
kWh
- $(-480.0) $(-400.0)
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,355 $1,750 - $1,355
-
MMBtu
- -
07 2.2163: Use minimum steam operating pressure $200 $115 - $200
-
MMBtu
- -
TOTAL RECOMMENDED $73,409 $99,083 $41,016
700,583
kWh
$33,273
-
MMBtu
$(-480.0) $(-400.0)
TOTAL IMPLEMENTED $48,143 $87,285 $15,750
277,912
kWh
$33,273
-
MMBtu
$(-480.0) $(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs