Assessment Year | 2005 |
---|---|
Principal Product | Milk Processing |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
78,000
ft2
|
Annual Production | 72,000
Tgal
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $552,444 | 12,302,400 |
kWh
|
$0.045 |
Electricity Demand | $143,058 | 24,137 |
kW-mo/yr
|
$5.93 |
Electricity Fees | $88,796 | - |
|
- |
Natural Gas | $182,773 | 21,705 |
MMBtu
|
$8.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,143 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $31,718 | $82,200 | - |
$31,718
-
MMBtu
|
- | - | |
02 | 2.4323: Use optimum size and capacity equipment | $16,520 | $7,062 |
$16,520
275,979
kWh
|
- | - | - | |
03 | 2.4224: Upgrade controls on compressors | $11,973 | $2,750 |
$11,973
213,571
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,746 | $4,736 |
$8,746
146,692
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,897 | $470 |
$3,777
64,341
kWh
|
- | $(-480.0) | $(-400.0) | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,355 | $1,750 | - |
$1,355
-
MMBtu
|
- | - | |
07 | 2.2163: Use minimum steam operating pressure | $200 | $115 | - |
$200
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $73,409 | $99,083 |
$41,016
700,583
kWh
|
$33,273
-
MMBtu
|
$(-480.0) | $(-400.0) | ||
TOTAL IMPLEMENTED | $48,143 | $87,285 |
$15,750
277,912
kWh
|
$33,273
-
MMBtu
|
$(-480.0) | $(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs