| Assessment Year | 2004 |
|---|---|
| Principal Product | Printing Machine Manufacture |
| NAICS | 333244: Printing Machinery and Equipment Manufacturing |
| SIC | 3555: Printing Trades Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 98 |
| Plant Area |
40,000
ft2
|
| Annual Production | 15
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,146 | 631,008 |
kWh
|
$0.054 |
| Electricity Demand | $18,719 | 2,774 |
kW-mo/yr
|
$6.75 |
| Electricity Fees | $10,886 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,976 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $6,113 | $800 |
$7,613
128,241
kWh
|
$(-1,500.0) | - | |
| 02 | 2.4156: Establish a preventative maintenance program | $3,213 | $1,250 |
$213
4,072
kWh
|
$(-7,000.0) | $10,000 | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $6,619 | $150 |
$6,619
125,893
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $(-147.0) | $1,015 |
$1,053
19,812
kWh
|
$(-1,200.0) | - | |
| 05 | 2.4314: Use synthetic lubricant | $696 | $189 |
$313
5,945
kWh
|
- | $383 | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $110 | $56 |
$110
2,034
kWh
|
- | - | |
| 07 | 2.2514: Cover open tanks | $34 | $25 |
$34
654
kWh
|
- | - | |
| TOTAL RECOMMENDED | $16,638 | $3,485 |
$15,955
286,651
kWh
|
$(-9,700.0) | $10,383 | ||
| TOTAL IMPLEMENTED | $9,976 | $1,481 |
$6,976
132,653
kWh
|
$(-7,000.0) | $10,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs