ITAC Assessment: MI0096
ITAC logo
ITAC Assessment: MI0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printing Machine Manufacture
NAICS 333244: Printing Machinery and Equipment Manufacturing
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 40,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,146 631,008
kWh
Electricity Demand $18,719 2,774
kW-mo/yr
Electricity Fees $10,886 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $6,113 $800 $7,613
128,241
kWh
$(-1,500.0) -
02 2.4156: Establish a preventative maintenance program $3,213 $1,250 $213
4,072
kWh
$(-7,000.0) $10,000
03 2.7221: Lower temperature during the winter season and vice-versa $6,619 $150 $6,619
125,893
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $(-147.0) $1,015 $1,053
19,812
kWh
$(-1,200.0) -
05 2.4314: Use synthetic lubricant $696 $189 $313
5,945
kWh
- $383
06 2.4231: Reduce the pressure of compressed air to the minimum required $110 $56 $110
2,034
kWh
- -
07 2.2514: Cover open tanks $34 $25 $34
654
kWh
- -
TOTAL RECOMMENDED $16,638 $3,485 $15,955
286,651
kWh
$(-9,700.0) $10,383
TOTAL IMPLEMENTED $9,976 $1,481 $6,976
132,653
kWh
$(-7,000.0) $10,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs