ITAC Assessment: MI0095
ITAC logo
ITAC Assessment: MI0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aircraft engine and engine parts manufacture
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 100,000
ft2
Annual Production 19,200
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,958 3,342,800
kWh
Electricity Demand $78,258 9,578
kW-mo/yr
Electricity Fees $27,718 -
Natural Gas $149,521 21,286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $206,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.8114: Change rate schedules or other changes in utility service $3,778 $600 - - - $3,778 -
02 2.6218: Turn off equipment when not in use $70,081 $2,300 $70,081
1,250,823
kWh
- - - -
03 4.111: Add equipment/ operators to reduce production bottleneck $120,575 - $18,825
233,996
kWh
$10,460
-
MMBtu
$(-75,000.0) - $166,290
04 2.4323: Use optimum size and capacity equipment $2,100 $5,660 $2,100
42,321
kWh
- - - -
05 2.2511: Insulate bare equipment $862 $543 - $862
-
MMBtu
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,100 $144 $2,100
42,320
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,514 $894 $7,090
142,874
kWh
- $(-576.0) - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $458 $186 $458
15,733
kWh
- - - -
TOTAL RECOMMENDED $206,468 $10,327 $100,654
1,728,067
kWh
$11,322
-
MMBtu
$(-75,576.0) $3,778 $166,290
TOTAL IMPLEMENTED $2,558 $330 $2,558
58,053
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs