Assessment Year | 2004 |
---|---|
Principal Product | Aircraft engine and engine parts manufacture |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
100,000
ft2
|
Annual Production | 19,200
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $162,958 | 3,342,800 |
kWh
|
$0.049 |
Electricity Demand | $78,258 | 9,578 |
kW-mo/yr
|
$8.17 |
Electricity Fees | $27,718 | - |
|
- |
Natural Gas | $149,521 | 21,286 |
MMBtu
|
$7.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $206,468 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,558 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $3,778 | $600 | - | - | - | $3,778 | - | |
02 | 2.6218: Turn off equipment when not in use | $70,081 | $2,300 |
$70,081
1,250,823
kWh
|
- | - | - | - | |
03 | 4.111: Add equipment/ operators to reduce production bottleneck | $120,575 | - |
$18,825
233,996
kWh
|
$10,460
-
MMBtu
|
$(-75,000.0) | - | $166,290 | |
04 | 2.4323: Use optimum size and capacity equipment | $2,100 | $5,660 |
$2,100
42,321
kWh
|
- | - | - | - | |
05 | 2.2511: Insulate bare equipment | $862 | $543 | - |
$862
-
MMBtu
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,100 | $144 |
$2,100
42,320
kWh
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,514 | $894 |
$7,090
142,874
kWh
|
- | $(-576.0) | - | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $458 | $186 |
$458
15,733
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $206,468 | $10,327 |
$100,654
1,728,067
kWh
|
$11,322
-
MMBtu
|
$(-75,576.0) | $3,778 | $166,290 | ||
TOTAL IMPLEMENTED | $2,558 | $330 |
$2,558
58,053
kWh
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs