ITAC Assessment: MI0092
ITAC logo
ITAC Assessment: MI0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Spice Manufacturing and Packaging
NAICS 311942: Spice and Extract Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 109
Plant Area 64,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,861 1,351,920
kWh
Electricity Demand $36,857 4,997
kW-mo/yr
Electricity Fees $17,177 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $27,250 $720 $27,250
517,962
kWh
-
02 4.425: Eliminate/reduce redundant inspections $21,190 $50,000 $(-60.0)
(-1,137)
kWh
$21,250
03 2.4221: Install compressor air intakes in coolest locations $405 $38,956 $405
7,625
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $578 - $578
10,997
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $3,474 $223 $3,474
66,040
kWh
-
06 2.4226: Use / purchase optimum sized compressor $5,031 $1,350 $5,031
95,623
kWh
-
TOTAL RECOMMENDED $57,928 $91,249 $36,678
697,110
kWh
$21,250
TOTAL IMPLEMENTED $26,221 $51,350 $4,971
94,486
kWh
$21,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs