ITAC Assessment: MI0087
ITAC logo
ITAC Assessment: MI0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Textile finishing
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 100,000
ft2
Annual Production 1,800
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,761 3,312,852
kWh
Electricity Demand $51,892 6,744
kW-mo/yr
Electricity Fees $27,051 -
Natural Gas $474,068 73,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,721 $590 $4,801
54,657
kWh
- $(-2,080.0) -
02 2.4221: Install compressor air intakes in coolest locations $1,417 $223 $1,417
28,517
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,760 $300 - $1,760
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $18,320 $14,068 - $18,320
-
MMBtu
- -
05 2.8114: Change rate schedules or other changes in utility service $1,075 $40 - - - $1,075
TOTAL RECOMMENDED $25,293 $15,221 $6,218
83,174
kWh
$20,080
-
MMBtu
$(-2,080.0) $1,075
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs