ITAC Assessment: MI0086
ITAC logo
ITAC Assessment: MI0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aircraft Engine Parts Remanufacturing
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 45,480
ft2
Annual Production 200
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,926 1,648,320
kWh
Electricity Demand $75,691 9,491
kW-mo/yr
Electricity Fees $20,357 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $121,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $21,915 $2,300 $21,915
369,941
kWh
- -
02 2.6218: Turn off equipment when not in use $3,200 $2,300 $3,200
66,936
kWh
- -
03 2.7229: Air condition only space necessary $792 $80 $792
15,836
kWh
- -
04 4.652: Replace existing equipment with more suitable substitutes $90,000 $50,000 - - $90,000
05 3.5315: Lease / purchase baler; sell cardboard to recycler $120 $15 - $120 -
06 2.4239: Eliminate or reduce compressed air usage $1,490 $610 $1,490
29,281
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $340 $386 $340
6,460
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,615 $490 $3,615
68,627
kWh
- -
TOTAL RECOMMENDED $121,472 $56,181 $31,352
557,081
kWh
$120 $90,000
TOTAL IMPLEMENTED $121,352 $56,166 $31,352
557,081
kWh
- $90,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs