ITAC Assessment: MI0083
ITAC logo
ITAC Assessment: MI0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aircraft landing gear repair and re-manufacture
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 221
Plant Area 108,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,481 4,413,602
kWh
Electricity Demand $76,247 9,874
kW-mo/yr
Electricity Fees $54,150 -
Natural Gas $55,613 5,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $19,455 - - - - $19,455
02 4.821: Pay bills on time to avoid late fees $1,951 $50 - - - $1,951
03 2.4221: Install compressor air intakes in coolest locations $1,767 $3,000 $1,767
33,613
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,084 $800 - $3,084
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,493 $2,670 $6,573
125,082
kWh
- $(-2,080.0) -
TOTAL RECOMMENDED $30,750 $6,520 $8,340
158,695
kWh
$3,084
-
MMBtu
$(-2,080.0) $21,406
TOTAL IMPLEMENTED $11,295 $6,520 $8,340
158,695
kWh
$3,084
-
MMBtu
$(-2,080.0) $1,951
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs