ITAC Assessment: MI0070
ITAC logo
ITAC Assessment: MI0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Lumber, pre-fabricated roof truss, fabricated rebar’s
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 522,720
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,940 1,158,900
kWh
Electricity Demand $26,504 3,608
kW-mo/yr
Electricity Fees $16,878 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $230,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $21,868 $2,300 $21,868
368,341
kWh
-
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $197,433 $74,805 $570
9,763
kWh
$196,863
03 2.6218: Turn off equipment when not in use $175 - $175
3,513
kWh
-
04 2.4131: Size electric motors for peak operating efficiency $11,397 $5,248 $847
16,092
kWh
$10,550
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,027 - $1,027
19,241
kWh
-
TOTAL RECOMMENDED $231,900 $82,353 $24,487
416,950
kWh
$207,413
TOTAL IMPLEMENTED $230,698 $82,353 $23,285
394,196
kWh
$207,413
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs