ITAC Assessment: MI0004
ITAC logo
ITAC Assessment: MI0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Residential lamps and lampshades
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 84,507
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,908 650,978
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,901 $2,000 $1,901
27,154
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,000 $312 $3,000
42,857
kWh
-
03 3.2123: Convert to high volume low pressure (hvlp) paint guns $11,236 $2,000 - $11,236
04 2.7111: Reduce illumination to minimum necessary levels $697 $221 $697
9,952
kWh
-
05 3.1191: Change procedures / equipment / operating conditions $861 $14 $861
12,298
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $3,210 $1,060 $3,210
45,864
kWh
-
TOTAL RECOMMENDED $20,905 $5,607 $9,669
138,125
kWh
$11,236
TOTAL IMPLEMENTED $4,558 $547 $4,558
65,107
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs