ITAC Assessment: MI0003
ITAC logo
ITAC Assessment: MI0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Ship and boat equipment
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 490
Plant Area 430,000
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 4,188
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $643,050 10,126,771
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $238,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,015 $10,000 $4,015
66,816
kWh
- - -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $40,000 $15,120 - - $40,000 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,044 $312 $4,044
63,189
kWh
- - -
04 3.4155: Meter waste water $25,076 $3,650 - $25,076
-
Tgal
- -
05 4.122: Develop standard procedures to improve internal yields $125,000 $136,000 - - - $125,000
06 4.423: Move product using mechanical means $40,000 $2,900 - - $40,000 -
TOTAL RECOMMENDED $238,135 $167,982 $8,059
130,005
kWh
$25,076
-
Tgal
$80,000 $125,000
TOTAL IMPLEMENTED $44,044 $3,212 $4,044
63,189
kWh
- $40,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs