Assessment Year | 2001 |
---|---|
Principal Product | Ship and boat equipment |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 490 |
Plant Area |
430,000
ft2
|
Annual Production | 45,000,000
units
|
Production Hrs. Annual | 4,188
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $643,050 | 10,126,771 |
kWh
|
$0.064 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $238,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,044 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,015 | $10,000 |
$4,015
66,816
kWh
|
- | - | - | |
02 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $40,000 | $15,120 | - | - | $40,000 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,044 | $312 |
$4,044
63,189
kWh
|
- | - | - | |
04 | 3.4155: Meter waste water | $25,076 | $3,650 | - |
$25,076
-
Tgal
|
- | - | |
05 | 4.122: Develop standard procedures to improve internal yields | $125,000 | $136,000 | - | - | - | $125,000 | |
06 | 4.423: Move product using mechanical means | $40,000 | $2,900 | - | - | $40,000 | - | |
TOTAL RECOMMENDED | $238,135 | $167,982 |
$8,059
130,005
kWh
|
$25,076
-
Tgal
|
$80,000 | $125,000 | ||
TOTAL IMPLEMENTED | $44,044 | $3,212 |
$4,044
63,189
kWh
|
- | $40,000 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs