ITAC Assessment: ME0300
ITAC logo
ITAC Assessment: ME0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Adhesives
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 106,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,685 3,588,218
kWh
Electricity Demand $64,174 7,895
kW-mo/yr
Electricity Fees $(-1,252.0) -
Natural Gas $130,904 19,772
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7314: Reduce ventilation air $42,906 $66,000 $15,647
309,203
kWh
- $27,259
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,547 $13,428 $4,086
80,891
kWh
$2,461
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $765 $850 $765
15,240
kWh
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,323 $3,625 $2,669
12,309
kWh
- $(-346.0)
-
MMBtu
-
05 4.441: Install automatic packing equipment $5,600 $9,000 - - - $5,600
TOTAL RECOMMENDED $58,141 $92,903 $23,167
417,643
kWh
$2,461
-
kW-mo/yr
$26,913
-
MMBtu
$5,600
TOTAL IMPLEMENTED $5,600 $9,000 - - - $5,600
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs