| Assessment Year | 2000 |
|---|---|
| Principal Product | Adhesives |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 114 |
| Plant Area |
106,000
ft2
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $181,685 | 3,588,218 |
kWh
|
$0.051 |
| Electricity Demand | $64,174 | 7,895 |
kW-mo/yr
|
$8.13 |
| Electricity Fees | $(-1,252.0) | - |
|
- |
| Natural Gas | $130,904 | 19,772 |
MMBtu
|
$6.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,141 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,600 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7314: Reduce ventilation air | $42,906 | $66,000 |
$15,647
309,203
kWh
|
- |
$27,259
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,547 | $13,428 |
$4,086
80,891
kWh
|
$2,461
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $765 | $850 |
$765
15,240
kWh
|
- | - | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,323 | $3,625 |
$2,669
12,309
kWh
|
- |
$(-346.0)
-
MMBtu
|
- | |
| 05 | 4.441: Install automatic packing equipment | $5,600 | $9,000 | - | - | - | $5,600 | |
| TOTAL RECOMMENDED | $58,141 | $92,903 |
$23,167
417,643
kWh
|
$2,461
-
kW-mo/yr
|
$26,913
-
MMBtu
|
$5,600 | ||
| TOTAL IMPLEMENTED | $5,600 | $9,000 | - | - | - | $5,600 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs