ITAC Assessment: ME0298
ITAC logo
ITAC Assessment: ME0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pine Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 43,070
ft2
Annual Production 8,000,000
thousand feet
Production Hrs. Annual 2,350
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,014 1,976,846
kWh
Electricity Demand $6,031 7,758
kW-mo/yr
Electricity Fees $469 -
Fuel Oil #2 $3,111 447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Increase in Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,240 $66,900 $35,240
497,069
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,062 $5,845 $1,542
19,637
kWh
$520
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,392 $340 $1,392
19,637
kWh
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $241 $450 $241
3,517
kWh
- - - -
05 2.2123: Insulate feedwater tank $88 $250 - - $88
-
MMBtu
- -
06 3.1192: Reduce scrap production $61,470 $204,600 - - - $(-3,330.0)
-
lb
$64,800
07 4.114: Add/modify equipment to improve drying process $20,769 - - - - - $20,769
TOTAL RECOMMENDED $121,262 $278,385 $38,415
539,860
kWh
$520
-
kW-mo/yr
$88
-
MMBtu
$(-3,330.0)
-
lb
$85,569
TOTAL IMPLEMENTED $36,632 $67,240 $36,632
516,706
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs