ITAC Assessment: ME0291
ITAC logo
ITAC Assessment: ME0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Hardwood lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 25,500
ft2
Annual Production 6,700,000
thousand feet
Production Hrs. Annual 2,350
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,058 843,200
kWh
Electricity Demand $31,330 5,207
kW-mo/yr
LPG $12,751 1,337
MMBtu
Fuel Oil #2 $972 245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings By-product Production Savings
01 2.4239: Eliminate or reduce compressed air usage $4,702 $60 $4,702
52,169
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,538 $3,943 $3,222
35,756
kWh
$316
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $3,294 $4,112 - - - $3,294
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,828 $160 $2,828
31,360
kWh
- - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $790 $750 $1,071
11,723
kWh
$97
-
kW-mo/yr
$(-378.0)
-
MMBtu
- -
06 2.4131: Size electric motors for peak operating efficiency $694 $160 $694
7,620
kWh
- - - -
07 2.7261: Install timers and/or thermostats $67 $100 $67
879
kWh
- - - -
08 3.6123: Burn wood by-products for heat $28,257 $53,000 $(-3,120.0)
(-24,033)
kWh
$(-217.0)
-
kW-mo/yr
$35,039
-
MMBtu
- $(-3,445.0)
TOTAL RECOMMENDED $44,170 $62,285 $9,464
115,474
kWh
$196
-
kW-mo/yr
$34,661
-
MMBtu
$3,294
-
MMBtu
$(-3,445.0)
TOTAL IMPLEMENTED $6,816 $4,432 $3,522
38,980
kWh
- - $3,294
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs