Assessment Year | 2000 |
---|---|
Principal Product | Hardwood lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
25,500
ft2
|
Annual Production | 6,700,000
thousand feet
|
Production Hrs. Annual | 2,350
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,058 | 843,200 |
kWh
|
$0.093 |
Electricity Demand | $31,330 | 5,207 |
kW-mo/yr
|
$6.02 |
LPG | $12,751 | 1,337 |
MMBtu
|
$9.54 |
Fuel Oil #2 | $972 | 245 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,170 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,816 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $4,702 | $60 |
$4,702
52,169
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,538 | $3,943 |
$3,222
35,756
kWh
|
$316
-
kW-mo/yr
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $3,294 | $4,112 | - | - | - |
$3,294
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,828 | $160 |
$2,828
31,360
kWh
|
- | - | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $790 | $750 |
$1,071
11,723
kWh
|
$97
-
kW-mo/yr
|
$(-378.0)
-
MMBtu
|
- | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $694 | $160 |
$694
7,620
kWh
|
- | - | - | - | |
07 | 2.7261: Install timers and/or thermostats | $67 | $100 |
$67
879
kWh
|
- | - | - | - | |
08 | 3.6123: Burn wood by-products for heat | $28,257 | $53,000 |
$(-3,120.0)
(-24,033)
kWh
|
$(-217.0)
-
kW-mo/yr
|
$35,039
-
MMBtu
|
- | $(-3,445.0) | |
TOTAL RECOMMENDED | $44,170 | $62,285 |
$9,464
115,474
kWh
|
$196
-
kW-mo/yr
|
$34,661
-
MMBtu
|
$3,294
-
MMBtu
|
$(-3,445.0) | ||
TOTAL IMPLEMENTED | $6,816 | $4,432 |
$3,522
38,980
kWh
|
- | - |
$3,294
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs