Assessment Year | 1994 |
---|---|
Principal Product | Folding Cartons |
NAICS |
n/a
|
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $10 M to 50M |
# of Employees | 195 |
Plant Area |
130,000
ft2
|
Annual Production | 14,000,000
lb
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $415,704 | 5,222,743 |
kWh
|
$0.080 |
Natural Gas | $126,033 | 29,057 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,290 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $10,579 | $13,778 |
$10,579
133,060
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $1,520 | $2,614 |
$1,520
19,050
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,908 | $210 |
$2,908
36,635
kWh
|
- | |
04 | 2.4314: Use synthetic lubricant | $824 | - |
$824
10,258
kWh
|
- | |
05 | 2.3212: Optimize plant power factor | $4,040 | $4,739 |
$4,040
-
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,853 | $400 | - |
$1,853
-
MMBtu
|
|
07 | 2.1213: Direct warmest air to combustion intake | $273 | $500 | - |
$273
-
MMBtu
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,146 | $6,550 |
$2,146
26,964
kWh
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,858 | $900 |
$2,858
36,635
kWh
|
- | |
TOTAL RECOMMENDED | $27,001 | $29,691 |
$24,875
262,602
kWh
|
$2,126
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,290 | $15,078 |
$13,437
169,695
kWh
|
$1,853
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs