ITAC Assessment: SF0026
ITAC logo
ITAC Assessment: SF0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Folding Cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 130,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 5,928
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,704 5,222,743
kWh
Natural Gas $126,033 29,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $10,579 $13,778 $10,579
133,060
kWh
-
02 2.7135: Install occupancy sensors $1,520 $2,614 $1,520
19,050
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,908 $210 $2,908
36,635
kWh
-
04 2.4314: Use synthetic lubricant $824 - $824
10,258
kWh
-
05 2.3212: Optimize plant power factor $4,040 $4,739 $4,040
-
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,853 $400 - $1,853
-
MMBtu
07 2.1213: Direct warmest air to combustion intake $273 $500 - $273
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,146 $6,550 $2,146
26,964
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,858 $900 $2,858
36,635
kWh
-
TOTAL RECOMMENDED $27,001 $29,691 $24,875
262,602
kWh
$2,126
-
MMBtu
TOTAL IMPLEMENTED $15,290 $15,078 $13,437
169,695
kWh
$1,853
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs