ITAC Assessment: ME0279
ITAC logo
ITAC Assessment: ME0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cooked potato products
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 66,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,857 14,194,901
kWh
Electricity Demand $217,356 34,832
kW-mo/yr
Electricity Fees $67,728 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,321,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 4.652: Replace existing equipment with more suitable substitutes $1,257,001 $332,109 $74,250
1,650,352
kWh
$28,080
-
kW-mo/yr
$(-55,329.0)
-
MMBtu
- - $1,210,000 -
02 2.2511: Insulate bare equipment $36,509 $13,360 $36,509
802,169
kWh
- - - - - -
03 2.8121: Apply for tax-free status for energy purchases $12,800 - - - - - - $12,800 -
04 2.4221: Install compressor air intakes in coolest locations $2,824 $900 $2,824
62,720
kWh
- - - - - -
05 2.4133: Use most efficient type of electric motors $1,720 $6,216 $1,420
31,653
kWh
$300
-
kW-mo/yr
- - - - -
06 2.8114: Change rate schedules or other changes in utility service $493 $1,754 $(-296.0)
(-5,862)
kWh
$(-51.0)
-
kW-mo/yr
- - $(-36.0) $876 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $201 $89 $161
3,517
kWh
$40
-
kW-mo/yr
- - - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $9,525 $10,000 - - - $11,250
-
lb
$1,275 $(-3,000.0) -
09 3.4151: Minimize water usage $751 $1,345 - - - - - - $751
-
Tgal
TOTAL RECOMMENDED $1,321,824 $365,773 $114,868
2,544,549
kWh
$28,369
-
kW-mo/yr
$(-55,329.0)
-
MMBtu
$11,250
-
lb
$1,239 $1,220,676 $751
-
Tgal
TOTAL IMPLEMENTED $51,981 $21,010 $38,090
837,339
kWh
$340
-
kW-mo/yr
- - - $12,800 $751
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs