Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Paper bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range n/a
# of Employees 95
Plant Area 100,000
ft2
Annual Production 33,175
ton
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,198 2,675,804
kWh
Electricity Demand $46,792 5,663
kW-mo/yr
Electricity Fees $720 -
Natural Gas $7,854 1,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,966 $720 $8,812
77,505
kWh
$1,154
-
kW-mo/yr
- - -
02 2.6212: Turn off equipment during breaks, reduce operating time $5,989 $1,000 $5,287
46,500
kWh
$702
-
kW-mo/yr
- - -
03 2.7226: Use computer programs to optimize hvac performance $4,898 $1,000 $4,898
43,076
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,115 $6,000 $2,752
24,205
kWh
$363
-
kW-mo/yr
- - -
05 2.1221: Replace obsolete burners with more efficient ones $2,448 $2,560 - - $2,448
-
MMBtu
- -
06 2.7111: Reduce illumination to minimum necessary levels $2,446 - $2,161
19,008
kWh
$285
-
kW-mo/yr
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,422 $10,000 - - - $8,422
-
lb
-
08 2.8123: Pay utility bills on time $7,456 - - - - - $7,456
TOTAL RECOMMENDED $44,740 $21,280 $23,910
210,294
kWh
$2,504
-
kW-mo/yr
$2,448
-
MMBtu
$8,422
-
lb
$7,456
TOTAL IMPLEMENTED $20,836 $13,280 $8,812
77,505
kWh
$1,154
-
kW-mo/yr
$2,448
-
MMBtu
$8,422
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings