Assessment Year | 1999 |
---|---|
Principal Product | sheet printing |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 86 |
Plant Area |
52,000
ft2
|
Annual Production | 6,720,000
pieces
|
Production Hrs. Annual | 4,300
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,699 | 1,662,661 |
kWh
|
$0.074 |
Electricity Demand | $52,197 | 5,474 |
kW-mo/yr
|
$9.54 |
Electricity Fees | $497 | - |
|
- |
LPG | $726 | 81 |
MMBtu
|
$8.96 |
Fuel Oil #2 | $3,369 | 617 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,681 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.631: Install an uninteruptable power supply | $46,000 | $73,198 | - | - | - | - | $46,000 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,878 | $5,249 |
$2,131
28,722
kWh
|
$747
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,418 | $100 |
$1,418
19,050
kWh
|
- | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $1,457 | $1,191 | - | - | - |
$1,457
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,080 | $220 |
$1,080
14,654
kWh
|
- | - | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $975 | $1,326 |
$950
12,896
kWh
|
$515
-
kW-mo/yr
|
- |
$(-490.0)
-
MMBtu
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,183 | $780 |
$1,400
19,050
kWh
|
$505
-
kW-mo/yr
|
$(-722.0)
-
MMBtu
|
- | - | |
08 | 2.7211: Clean and maintain refrigerant condensers and towers | $594 | $60 |
$594
7,913
kWh
|
- | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $593 | $150 |
$593
8,499
kWh
|
- | - | - | - | |
10 | 2.4133: Use most efficient type of electric motors | $335 | $740 |
$258
3,517
kWh
|
$77
-
kW-mo/yr
|
- | - | - | |
11 | 2.8121: Apply for tax-free status for energy purchases | $114 | - | - | - | - | - | $114 | |
12 | 2.8121: Apply for tax-free status for energy purchases | $54 | - | - | - | - | - | $54 | |
TOTAL RECOMMENDED | $56,681 | $83,014 |
$8,424
114,301
kWh
|
$1,844
-
kW-mo/yr
|
$(-722.0)
-
MMBtu
|
$967
-
MMBtu
|
$46,168 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs