ITAC Assessment: ME0275
ITAC logo
ITAC Assessment: ME0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product sheet printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 52,000
ft2
Annual Production 6,720,000
pieces
Production Hrs. Annual 4,300
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,699 1,662,661
kWh
Electricity Demand $52,197 5,474
kW-mo/yr
Electricity Fees $497 -
LPG $726 81
MMBtu
Fuel Oil #2 $3,369 617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 4.631: Install an uninteruptable power supply $46,000 $73,198 - - - - $46,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,878 $5,249 $2,131
28,722
kWh
$747
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,418 $100 $1,418
19,050
kWh
- - - -
04 2.2437: Recover waste heat from equipment $1,457 $1,191 - - - $1,457
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,080 $220 $1,080
14,654
kWh
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $975 $1,326 $950
12,896
kWh
$515
-
kW-mo/yr
- $(-490.0)
-
MMBtu
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,183 $780 $1,400
19,050
kWh
$505
-
kW-mo/yr
$(-722.0)
-
MMBtu
- -
08 2.7211: Clean and maintain refrigerant condensers and towers $594 $60 $594
7,913
kWh
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $593 $150 $593
8,499
kWh
- - - -
10 2.4133: Use most efficient type of electric motors $335 $740 $258
3,517
kWh
$77
-
kW-mo/yr
- - -
11 2.8121: Apply for tax-free status for energy purchases $114 - - - - - $114
12 2.8121: Apply for tax-free status for energy purchases $54 - - - - - $54
TOTAL RECOMMENDED $56,681 $83,014 $8,424
114,301
kWh
$1,844
-
kW-mo/yr
$(-722.0)
-
MMBtu
$967
-
MMBtu
$46,168
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs