Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Printed Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 73,820
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 4,480
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,570 658,183
kWh
Electricity Demand $17,395 2,088
kW-mo/yr
Natural Gas $14,568 952
MMBtu
Fuel Oil #2 $11,562 284
MMBtu
Other Energy $41,424 904
MMBtu
TOTAL YEARLY COSTS $184,519
RECOMMENDED SAVINGS* $61,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,467 - $2,149
14,203
kWh
$318
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,769 $260 $1,499
9,905
kWh
$270
-
kW-mo/yr
- - - -
03 2.7224: Reduce space conditioning during non-working hours $9,849 $3,482 $2,099
13,871
kWh
- $7,750
-
MMBtu
- - -
04 2.1321: Replace fossil fuel equipment with electrical equipment $34,250 $35,738 $(-8,538.0)
(-56,432)
kWh
- - $41,222
-
MMBtu
$1,566 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,067 $1,675 $744
4,916
kWh
$172
-
kW-mo/yr
- - $167 $(-16.0)
06 2.9114: Use solar heat to make electricty $12,549 $55,774 $12,549
82,942
kWh
- - - - -
TOTAL RECOMMENDED $61,951 $96,929 $10,502
69,405
kWh
$760
-
kW-mo/yr
$7,750
-
MMBtu
$41,222
-
MMBtu
$1,733 $(-16.0)
TOTAL IMPLEMENTED $61,951 $96,929 $10,502
69,405
kWh
$760
-
kW-mo/yr
$7,750
-
MMBtu
$41,222
-
MMBtu
$1,733 $(-16.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs