Assessment Year | 1999 |
---|---|
Principal Product | Low Carbon Steel Castings |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
111,000
ft2
|
Annual Production | 1,925
ton
|
Production Hrs. Annual | 2,110
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $772,669 | 8,695,194 |
kWh
|
$0.089 |
Electricity Fees | $83,377 | - |
|
- |
LPG | $133,075 | 27,178 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $27,426 | $27,050 | n/a | - | - | - | - | $27,426 | - |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,039 | $14,259 | n/a |
$14,316
204,572
kWh
|
$(-4,277.0)
-
MMBtu
|
- | - | - | - |
03 | 2.2437: Recover waste heat from equipment | $5,786 | $14,670 | n/a |
$5,786
346,131
kWh
|
- | - | - | - | - |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,882 | $825 | n/a |
$5,538
79,132
kWh
|
$(-1,656.0)
-
MMBtu
|
- | - | - | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,789 | $7,571 | n/a |
$2,789
39,859
kWh
|
- | - | - | - | - |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,182 | $500 | n/a |
$3,182
45,428
kWh
|
- | - | - | - | - |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $371 | $980 | n/a |
$371
5,275
kWh
|
- | - | - | - | - |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $470 | $100 | n/a |
$470
6,741
kWh
|
- | - | - | - | - |
09 | 3.1161: Eliminate/reduce an operation | $16,433 | $2,400 | n/a |
$3,503
50,117
kWh
|
$6,064
-
MMBtu
|
- |
$6,866
-
lb
|
- | - |
10 | 3.4151: Minimize water usage | $1,674 | $868 | n/a |
$1,176
16,706
kWh
|
- |
$246
-
Tgal
|
- | - |
$252
-
Tgal
|
11 | 3.4151: Minimize water usage | $120 | $85 | n/a |
$84
1,172
kWh
|
- |
$18
-
Tgal
|
- | - |
$18
-
Tgal
|
TOTAL RECOMMENDED | $72,172 | $69,308 |
$37,215
795,133
kWh
|
$131
-
MMBtu
|
$264
-
Tgal
|
$6,866
-
lb
|
$27,426 |
$270
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs