ITAC Assessment: ME0271
ITAC logo
ITAC Assessment: ME0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product pine boards
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 59,000
ft2
Annual Production 3,750,000
thousand feet
Production Hrs. Annual 2,312
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,261 3,037,515
kWh
Electricity Demand $62,431 9,262
kW-mo/yr
Electricity Fees $1,159 -
Wood $39,168 52,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,060 $47,675 $27,060
410,023
kWh
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,694 $11,058 $2,585
39,273
kWh
$1,109
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $1,248 $150 $1,248
18,757
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $731 $1,580 $505
12,309
kWh
$226
-
kW-mo/yr
- - - -
05 2.2511: Insulate bare equipment $366 $407 - - $366
-
MMBtu
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $224 $100 $224
3,517
kWh
- - - - -
07 3.4151: Minimize water usage $8,700 $6,800 $(-300.0)
(-3,517)
kWh
- - - - $9,000
-
Tgal
08 3.3113: Use other methods for neutralization $6,000 $7,800 - - - - $6,000 -
09 3.4155: Meter waste water $1,684 $200 - - - $1,684
-
gal
- -
TOTAL RECOMMENDED $49,707 $75,770 $31,322
480,362
kWh
$1,335
-
kW-mo/yr
$366
-
MMBtu
$1,684
-
gal
$6,000 $9,000
-
Tgal
TOTAL IMPLEMENTED $34,276 $59,590 $31,117
471,570
kWh
$1,109
-
kW-mo/yr
$366
-
MMBtu
$1,684
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs