ITAC Assessment: IC0287
ITAC logo
ITAC Assessment: IC0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Rehabilitation
NAICS 622310: Specialty (except Psychiatric and Substance Abuse) Hospitals
SIC 8093: Specialty Outpatient Facilities, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 40
Plant Area 61,800
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,479 1,293,683
kWh
Electricity Demand $22,429 2,553
kW-mo/yr
Electricity Fees $(-5,630.6) -
Other Energy $9,626 498
MMBtu
TOTAL YEARLY COSTS $100,904
RECOMMENDED SAVINGS* $70,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,085 $11,049 $2,153
37,387
kWh
$932
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $277 $734 $274
4,758
kWh
$3
-
kW-mo/yr
03 2.7261: Install timers and/or thermostats $7,009 - $1,059
18,380
kWh
$5,951
-
kW-mo/yr
04 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $3,700 $49,430 $2,066
35,864
kWh
$1,635
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $56,830 $691,850 $46,733
811,340
kWh
$10,097
-
kW-mo/yr
TOTAL RECOMMENDED $70,902 $753,063 $52,285
907,728
kWh
$18,617
-
kW-mo/yr
TOTAL IMPLEMENTED $10,094 $11,049 $3,212
55,767
kWh
$6,882
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs