ITAC Assessment: AS0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Satellite communications equipment
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 125,000
ft2
Annual Production 105,000,000
lb
Production Hrs. Annual 7,248
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,902 6,340,734
kWh
Electricity Demand $31,967 12,320
kW-mo/yr
Electricity Fees $30,433 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,749 $1,000 $3,611
37,250
kWh
$138
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,877 $5,000 $2,771
28,582
kWh
$106
-
kW-mo/yr
03 2.2113: Repair or replace steam traps $107 $50 $107
1,887
kWh
-
04 2.7135: Install occupancy sensors $474 $150 $474
8,328
kWh
-
05 2.1213: Direct warmest air to combustion intake $912 $1,000 $912
14,279
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,302 $1,000 $7,033
72,550
kWh
$269
-
kW-mo/yr
07 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $8,063 $3,000 $8,063
302,390
kWh
-
TOTAL RECOMMENDED $23,484 $11,200 $22,971
465,266
kWh
$513
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs