Assessment Year | 2005 |
---|---|
Principal Product | Satellite communications equipment |
NAICS | 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
SIC | 3663: Radio and Television Broadcasting and Communications Equipment |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
125,000
ft2
|
Annual Production | 105,000,000
lb
|
Production Hrs. Annual | 7,248
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,902 | 6,340,734 |
kWh
|
$0.057 |
Electricity Demand | $31,967 | 12,320 |
kW-mo/yr
|
$2.59 |
Electricity Fees | $30,433 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,749 | $1,000 |
$3,611
37,250
kWh
|
$138
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,877 | $5,000 |
$2,771
28,582
kWh
|
$106
-
kW-mo/yr
|
|
03 | 2.2113: Repair or replace steam traps | $107 | $50 |
$107
1,887
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $474 | $150 |
$474
8,328
kWh
|
- | |
05 | 2.1213: Direct warmest air to combustion intake | $912 | $1,000 |
$912
14,279
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,302 | $1,000 |
$7,033
72,550
kWh
|
$269
-
kW-mo/yr
|
|
07 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $8,063 | $3,000 |
$8,063
302,390
kWh
|
- | |
TOTAL RECOMMENDED | $23,484 | $11,200 |
$22,971
465,266
kWh
|
$513
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs