Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ice-cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area 12,100
ft2
Annual Production 8,100,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,160 5,175,850
kWh
Electricity Demand $78,110 11,261
kW-mo/yr
Electricity Fees $80,126 -
Fuel Oil #2 $40,546 7,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,108 $11,800 $6,480
72,098
kWh
$1,500
-
kW-mo/yr
$(-2,872.0)
-
MMBtu
- - -
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,700 $900 $4,700
52,169
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,563 $2,500 $2,350
22,860
kWh
$213
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $512 $185 $512
5,569
kWh
- - - - -
05 2.1113: Reduce combustion air flow to optimum $337 $400 - - - $337
-
MMBtu
- -
06 2.2511: Insulate bare equipment $325 $400 - - - $325
-
MMBtu
- -
07 2.4133: Use most efficient type of electric motors $319 $590 - - - $319
-
MMBtu
- -
08 2.2511: Insulate bare equipment $236 $93 - - - $236
-
MMBtu
- -
09 3.7214: Reduce or eliminate waste $23,643 $31,200 - - - - $2,193
-
lb
$21,450
TOTAL RECOMMENDED $37,743 $48,068 $14,042
152,696
kWh
$1,713
-
kW-mo/yr
$(-2,872.0)
-
MMBtu
$1,217
-
MMBtu
$2,193
-
lb
$21,450
TOTAL IMPLEMENTED $8,992 $5,068 $7,562
80,598
kWh
$213
-
kW-mo/yr
- $1,217
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs