ITAC Assessment: DL0123
ITAC logo
ITAC Assessment: DL0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Cable Assembly
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 88,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,070 556,542
kWh
Natural Gas $13,028 1,153
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $1,760 - $1,760
10,000
kWh
- -
02 2.7124: Make a practice of turning off lights when not needed $3,240 - $3,240
18,400
kWh
- -
03 2.7124: Make a practice of turning off lights when not needed $2,740 $8,382 $2,740
15,540
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,880 $547 $1,880
10,700
kWh
- -
05 2.7229: Air condition only space necessary $1,250 - $1,250
7,100
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $1,900 - $1,900
10,790
kWh
- -
07 2.7221: Lower temperature during the winter season and vice-versa $990 $200 - $990
-
MMBtu
-
08 2.7221: Lower temperature during the winter season and vice-versa $350 - - $350
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $780 $200 - $780
-
MMBtu
-
10 2.7261: Install timers and/or thermostats $1,560 $400 - $1,560
-
MMBtu
-
11 2.7231: Use radiant heater for spot heating $2,610 $2,610 - $2,610
-
MMBtu
-
12 2.8114: Change rate schedules or other changes in utility service $14,200 - - - $14,200
TOTAL RECOMMENDED $33,260 $12,339 $12,770
72,530
kWh
$6,290
-
MMBtu
$14,200
TOTAL IMPLEMENTED $29,240 $12,139 $9,530
54,130
kWh
$5,510
-
MMBtu
$14,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs