Assessment Year | 1992 |
---|---|
Principal Product | AIRCRAFT ENGINE COMP. |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
n/a
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $457,227 | 9,079,133 |
kWh
|
$0.050 |
Natural Gas | $53,387 | 19,016 |
MMBtu
|
$2.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,140 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,193 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $37,088 | - |
$37,088
-
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,683 | $15,822 |
$3,046
88,804
kWh
|
$(-968.0)
-
MMBtu
|
$(-395.0) | |
03 | 2.7123: Keep lamps and reflectors clean | $17,658 | $14,750 |
$17,658
514,654
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,369 | - |
$1,369
39,859
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,947 | $7,825 |
$2,007
58,617
kWh
|
- | $(-60.0) | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,786 | $16,800 |
$3,786
80,598
kWh
|
- | - | |
07 | 2.7226: Use computer programs to optimize hvac performance | $8,609 | $16,800 |
$6,790
197,831
kWh
|
$1,819
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $72,140 | $71,997 |
$71,744
980,363
kWh
|
$851
-
MMBtu
|
$(-455.0) | ||
TOTAL IMPLEMENTED | $70,193 | $64,172 |
$69,737
921,746
kWh
|
$851
-
MMBtu
|
$(-395.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs