ITAC Assessment: OK0367
ITAC logo
ITAC Assessment: OK0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AIRCRAFT ENGINE COMP.
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,227 9,079,133
kWh
Natural Gas $53,387 19,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $37,088 - $37,088
-
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,683 $15,822 $3,046
88,804
kWh
$(-968.0)
-
MMBtu
$(-395.0)
03 2.7123: Keep lamps and reflectors clean $17,658 $14,750 $17,658
514,654
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,369 - $1,369
39,859
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,947 $7,825 $2,007
58,617
kWh
- $(-60.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,786 $16,800 $3,786
80,598
kWh
- -
07 2.7226: Use computer programs to optimize hvac performance $8,609 $16,800 $6,790
197,831
kWh
$1,819
-
MMBtu
-
TOTAL RECOMMENDED $72,140 $71,997 $71,744
980,363
kWh
$851
-
MMBtu
$(-455.0)
TOTAL IMPLEMENTED $70,193 $64,172 $69,737
921,746
kWh
$851
-
MMBtu
$(-395.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings